‘Leaving the contractor much freer to organise himself’
P. CORNER
(DIRECTOR OF DEFENCE QUALITY ASSURANCE (TECHNICAL))
42
Abstract
“WE NOW INTEND to define the end result in a considerable amount of detail and leave the contractor much freer to organise himself as best suits his particular product and the environment in which he works.”
Citation
CORNER, P. (1973), "‘Leaving the contractor much freer to organise himself’", Aircraft Engineering and Aerospace Technology, Vol. 45 No. 5, pp. 30-31. https://doi.org/10.1108/eb035023
Publisher
:MCB UP Ltd
Copyright © 1973, MCB UP Limited