Reflection on methodology of the correlation between electromagnetic interference and safety in high-speed railways

Chang Liu (Department of Electromagnetic Environmental Effects Technology Studio, CRSC Research and Design Institute Group Co., Ltd., Beijing, China) (School of Traffic and Transportation, Shijiazhuang Tiedao University, Shijiazhuang, China)
Shiwu Yang (School of Automation and Intelligence, Beijing Jiaotong University, Beijing, China)
Yixuan Yang (Infrastructure Technology Research Institute, CRSC Research and Design Institute Group Co., Ltd., Beijing, China)
Hefei Cao (Department of Electromagnetic Environmental Effects Technology Studio, CRSC Research and Design Institute Group Co., Ltd., Beijing, China)
Shanghe Liu (Research Center for Electromagnetic Environmental Effects, Shijiazhuang Tiedao University, Shijiazhuang, China)

Railway Sciences

ISSN: 2755-0907

Article publication date: 4 January 2024

Issue publication date: 1 February 2024

318

Abstract

Purpose

In the continuous development of high-speed railways, ensuring the safety of the operation control system is crucial. Electromagnetic interference (EMI) faults in signaling equipment may cause transportation interruptions, delays and even threaten the safety of train operations. Exploring the impact of disturbances on signaling equipment and establishing evaluation methods for the correlation between EMI and safety is urgently needed.

Design/methodology/approach

This paper elaborates on the necessity and significance of studying the impact of EMI as an unavoidable and widespread risk factor in the external environment of high-speed railway operations and continuous development. The current status of research methods and achievements from the perspectives of standard systems, reliability analysis and safety assessment are examined layer by layer. Additionally, it provides prospects for innovative ideas for exploring the quantitative correlation between EMI and signaling safety.

Findings

Despite certain innovative achievements in both domestic and international standard systems and related research for ensuring and evaluating railway signaling safety, there’s a lack of quantitative and strategic research on the degradation of safety performance in signaling equipment due to EMI. A quantitative correlation between EMI and safety has yet to be established. On this basis, this paper proposes considerations for research methods pertaining to the correlation between EMI and safety.

Originality/value

This paper overviews a series of methods and outcomes derived from domestic and international studies regarding railway signaling safety, encompassing standard systems, reliability analysis and safety assessment. Recognizing the necessity for quantitatively describing and predicting the impact of EMI on high-speed railway signaling safety, an innovative approach using risk assessment techniques as a bridge to establish the correlation between EMI and signaling safety is proposed.

Keywords

Citation

Liu, C., Yang, S., Yang, Y., Cao, H. and Liu, S. (2024), "Reflection on methodology of the correlation between electromagnetic interference and safety in high-speed railways", Railway Sciences, Vol. 3 No. 1, pp. 84-96. https://doi.org/10.1108/RS-11-2023-0045

Publisher

:

Emerald Publishing Limited

Copyright © 2023, Chang Liu, Shiwu Yang, Yixuan Yang, Hefei Cao and Shanghe Liu

License

Published in Railway Sciences. Published by Emerald Publishing Limited. This article is published under the Creative Commons Attribution (CC BY 4.0) licence. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this licence may be seen at http://creativecommons.org/licences/by/4.0/legalcode


1. The impact of EMI on the signaling safety of high-speed railways

With the large-scale construction and continuous increase in operational mileage of high-speed railways in China, despite the gradual improvement in safety assurance designs, the escalating traction load, the addition of various locomotive types and other complex operational conditions are presenting an increasing number of safety hazards to the railway transportation system. These factors contribute to a more challenging electromagnetic environment for the signaling system’s operation.

The high-speed railway system can be regarded as an open, vast and intricate electromagnetic system consisting of strong and weak electrical components. The signaling system within it relies on microelectronic logic circuits and control software to generate, transmit and respond to signals, making it highly sensitive to sources of strong electromagnetic interference (EMI) (e.g., traction power systems, GSM-R mobile base stations, electric locomotives, etc.) (Yang, Chen, Chen, Cui, & Tang, 2019; Liu et al., 2020a, b; Liu et al., 2021; Yang & Liu, 2023). The impact of EMI and the propagation of risks among signaling equipment further affect the overall safety of the high-speed railway system. Operational statistics indicate frequent occurrences of faults in high-speed railway signaling equipment due to strong electromagnetic environmental interference. These faults range from impacting operational efficiency to posing threats to transportation safety, culminating in catastrophic accidents such as train collisions and casualties. Particularly, after the “7.23 EMU Accident on Yongwen Line” (China, 2011) caused by EMI from a lightning strike affecting the station’s train control center equipment (Wang, Wang, Roberts, Chen, & Zhang, 2017), there has been a heightened focus on improving EMI protection technology to enhance the safety performance of high-speed railway signaling systems.

Of notable concern is the rapid development in recent years of emerging information technologies such as artificial intelligence, big data, cloud computing, 5G and the Internet of Things, along with the construction and application of significant infrastructure and advanced intelligent equipment or systems. Adaptability to the electromagnetic environment and electromagnetic security has become crucial limiting factors for the reliable and safe operation of various intelligent equipment systems. In summary, to establish effective protection against EMI in signaling systems, assessing the impact of its safety hazards represents a key area worthy of further exploration and deepening within this field.

2. Analysis of the current research status on the signaling safety of high-speed railways under EMI

2.1 Safety-related standard system for high-speed railway signaling system

The research and standard systems concerning the safety of high-speed railway signaling systems are quite comprehensive. The international standard IEC 61508 (2010) for electronic and electrical equipment, including computer software and hardware systems, explicitly outlines universal analysis methods and evaluation systems based on the complete safety lifecycle. It defines metrics for system safety, specifically the safety integrity level (SIL). Furthermore, the European Committee for Electrotechnical Standardization (CENELEC) has established a comprehensive railway standard system that embodies safety principles (see Figure 1), which includes EN 50126 (2017), EN 50128 (2011), EN 50129 (2010) and EN 50159 (2018). These standards specify regulations for railway applications, covering (reliability, availability, maintainability and safety (RAMS), safety-related systems, software and communication signaling systems.

Referencing the above IEC and CENELEC standards, China has also formulated a series of corresponding reliability and safety-related standards, e.g., GB/T 20438 (2017), TB/T 2468 (2018a, b), TB/T 3133 (2006) and GB/T 21562 (2008), covering functional safety of safety-related systems, assessment of reliability requirements and RAMS for locomotive and vehicle electronic products. However, there is an overall lack of attention given to electromagnetic environmental factors, as well as shortcomings in interference-related risk assessment and analysis of potentially dangerous faults.

2.2 Reliability analysis of signaling equipment

Generally, the analysis of reliability and safety of signaling equipment is closely related. From a definition perspective, reliability is elucidated as the probability that a product can perform the required function under given conditions within a fixed time interval (t1,t2) (IEC 60050–692, 2017). Safety, on the other hand, is generally understood as the absence of danger, threat and accidents (Yang, Yang, Cui, & Pei, 2017) (in this context, safety refers to freedom from faults). While these concepts are closely interrelated, they also exhibit certain differences. Musa (1999) suggests that safety can be perceived as a subset of reliability, indicating the possibility of safety risks even when the equipment operates reliably (e.g. the hazards and risks caused by electromagnetic environmental interference discussed in this paper). Furthermore, the definition of reliability and safety issues are as follows:

  1. Reliability issues: when several components fail, causing the propagation of failures to other components in the system, resulting in an overall decrease in system performance;

  2. Safety issues: system or component failures that propagate and lead to system losses or personnel injuries due to certain degree of failure consequences.

Due to the highly complex structure and functional units of signaling systems, they play a crucial role in conveying safety-related information within the entire high-speed railway system. Once the system or equipment fails, it could lead to severe, even catastrophic consequences. Reliability spans the entire lifecycle of signaling equipment, encompassing research and development, design, production, on-site application, maintenance and aging replacement. Compared to other fields, signaling systems, which are vital for the national economy and transportation safety, must meet higher reliability requirements. There is a certain research foundation both domestically and internationally for reliability analysis and related indicator calculations. Reliability techniques are also widely applied in the signaling domain to measure or enhance the safety performance of equipment/systems. Wu, Cai, and Lu (2019) used Petri nets to construct states and unit transitions based on different sensor information, proposing a reliability assessment method for train positioning units based on the Global Navigation Satellite System (GNSS). Chu (2018) established an internal component failure model using stochastic Petri nets and calculated the safety relay’s failure rate and reliability using Markov methods. Chen, Tian, Hillmansen, Clive, and Ning (2020) applied fault tree analysis (FTA) to propose a method for evaluating the reliability of a direct current electrified railway system. Zheng, Qin, Wang, Jia, and Zheng (2018) conducted a reliability analysis for the CRH2 high-speed train bogie system based on FTA and Bayesian network (BN).

However, existing efforts have shown relatively weak attention to the phenomenon of signaling equipment failures induced by EMI. Moreover, failure rates derived from reliability calculations may not directly translate to the impacts on safety. Additionally, identifying and pinpointing component/unit failures caused by electromagnetic environmental interference, as well as obtaining corresponding fault rates (also known as failure rates) and other reliability indicator parameters, are challenging to achieve in practical engineering. Therefore, it’s unfeasible to directly determine a quantitative relationship between interference levels and safety based solely on reliability assessments.

2.3 Safety assessment based on risk analysis

Existing research often considers system risk analysis as a part of system safety assessment, and risk assessment has become one of the most commonly used methods for evaluating safety. For instance, Lai, Zhong, Zhao, Qiu, and Liu (2021) focused on the safety elements of low-voltage direct current power supply systems, quantitatively assessing the risk of electrical shock. Zhang, Bai, Shi, Zhang, and Luo (2021) focused on the risk of lithium battery thermal runaway events, proposing and calculating relevant risk indices for safety assessment. Zeng, Bani-Mustafa, Flage, and Zio (2020) introduced a comprehensive framework for quantifying cognitive uncertainties in probabilistic risk assessment and validated it. However, existing studies typically rely on expert experience to assign risk levels, showing evident subjectivity and making it difficult to accurately and quantitatively derive objective weight vectors.

The “Fail-Safe” principle in railway signaling design (TB/T 2615, 2018) indicates that safety assessments of signaling systems should revolve around equipment failure modes and characteristics. When faults pose a threat to train operation safety, they are termed as dangerous faults. Presently, the most commonly used methods for risk assessment and calculation of dangerous faults rates employ the analytic hierarchy process (AHP). This method has seen partial application in the signaling domain. Wang and Yao (2020) constructed a risk index model for China Train Control System (CTCS)-3-level train control system equipment based on fuzzy AHP (FAHP) and laboratory decision-making methods. Liu (2017) integrated FTA and AHP to conduct comprehensive safety risk assessment of high-speed train braking systems. Yang et al. (2017) quantitatively analyzed the impact of EMI on the SIL of ZPW-2000A track circuit equipment using AHP.

In the application of railway signaling systems, even though decision analysts are experienced railway industry experts, the signaling equipment types vary across different lines and stations, exhibiting complexity in fault modes. Additionally, in the complex conditions of high-speed railways, the impact of the electromagnetic environment further complicates matters. Due to these factors, obtaining expert scoring data for a significant portion of equipment/failure types can be challenging. Hence, relying solely on expert subjective judgment to design an evaluation matrix with universality and high confidence becomes difficult. To overcome the significant limitation of the current methods being overly subjective, which can result in different evaluation results from different experts, it’s crucial to thoroughly analyze, classify and explore real EMI cases that affect safety performance on engineering sites. This approach allows for the effective rectification of latent risks related to fault modes. Simultaneously, improvements should be made to the risk assessment methods from multiple perspectives, thereby providing a reliable basis for obtaining and optimizing the risk weight vectors for signaling system risk assessment.

In conclusion, although domestic and international standard systems and related research have achieved some innovative results in ensuring and evaluating railway signaling safety, there is a lack of consideration regarding reducing biases caused by human factors. The algorithms and applications for safety analysis concerning high-speed railway signaling characteristics and complex electromagnetic environments still require improvement. Particularly, insufficient attention has been given to quantitative and strategic studies both domestically and internationally on the degradation of safety performance in signaling equipment caused by EMI. The quantitative correlation between EMI and safety has yet to be established. Consequently, there’s an inability to propose forward-thinking and guiding recommendations, especially under conditions where interference continues to intensify after further increasing the speed of high-speed railways (e.g., to 400 km/h). Given that risk assessment is a feasible means of transforming qualitative safety concepts into quantitative risk indicators, this paper takes it as an effective entry point to build a bridge between EMI and signaling safety and conducts innovative method research.

3. Research method on the correlation between EMI and safety based on risk assessment

3.1 Risk analysis method based on FTA-BN

Fault tree analysis (FTA) is a traditional and mature technique for assessing complex systems, widely applied across various domains such as safety, reliability and availability analysis (Li, Jiang, Wang, & Wang, 2020). Research on fault tree (FT) models typically involves qualitative and quantitative analyses. The former aims to identify all combinations of basic events that lead to top-level failures to locate potential hazards within the system. The latter involves solving failure rates from the bottom up and calculating the importance of basic events.

FT models encompass sets of sub-events within a given system that could lead to predefined system events. They use logical symbols (e.g., AND, OR, NOT gates) to represent functional relationships within the system/equipment. Through symbolic connections, they visually depict probable combinations and sequences of sub-events that could lead to system failures, with the logical sequence flowing from bottom events towards the top of the tree, ultimately forming a graphical representation of failure modes. The specific modeling steps are as follows:

  1. Analyze the structure and components of the system/equipment and gather relevant fault data from multiple sources.

  2. Identify top events for system/equipment failures based on technical performance indicators.

  3. Hierarchically and modularly construct the FT based on system/equipment schematics and reliability block diagrams.

  4. For complex system/equipment FT models, simplify as needed through techniques like modular decomposition.

On the other hand, BN models provide bidirectional pathways for both forward propagation and backward reasoning for uncertain information based on Bayesian probability theory (Shi et al., 2020). Visually represented as directed acyclic graphs, they reflect causal relationships between nodes across different hierarchical levels by calculating probabilities along the directed edges. These models use node variables to represent event units and portray interrelationships among events based on conditional probability tables (CPT). It facilitates the transformation from FT to BN, enabling causal reasoning starting from the root node’s prior probability and inverse reasoning to pinpoint risk vulnerabilities based on given node posterior probabilities.

BN models consist of a directed acyclic graph G=V,E, where V represents the set of nodes and E represents the set of directed edges between nodes, along with CPT (denoted as P) associated with each node, forming B=G,P. For any BN model containing n nodes, there exists a joint probability distribution, as shown in Eq. (1), where, conditioned on the parent nodes (i.e., nodes pointing to the child node Vi and conditionally independent of any non-parent nodes of Vi), π(Vi) represents a combination of variable values within the parent node set Vi.

(1)P(V1,V2,,Vn)=i=1nP(Vi|π(Vi))

The probability distribution obtained from existing experience and analysis serves as the prior probability, characterizing the “cause” events in the deduction process of failure events, primarily utilizing the law of total probability, as illustrated in Eq. (2). The probability distribution modified based on the prior probability and resultant information represents the posterior probability, corresponding to the “effect” in the “effect seeking cause” issue. The calculation rule is based on the Bayesian formula, as shown in Eq. (3).

(2)P(B)=i=1nP(Ai)P(B|Ai)
where for any complex event B, Ai(i=1,2,,n) forms a complete set of events.
(3)P(Ai|B)=P(B|Ai)P(Ai)j=1nP(B|Aj)P(Aj)
where P(A|B)=P(AB)/P(A)=P(A)×P(B)/P(A), is the conditional probability of A occurring when event B occurs and P(A)>0.

In summary, safety risk analysis based on FTA-BN primarily includes the following aspects: defining and decomposing the functional modular structure of the system/equipment, identifying basic elements within fault events and specifying direct dependencies among elements across different hierarchical levels. Subsequently, constructing the corresponding FT model and conducting qualitative as well as quantitative analyses. Establishing a BN-directed acyclic graph through mapping relationships, constructing CPT for each elemental variable conditioned on parent nodes, accomplishing risk predictions for “cause from effect” and investigating vulnerabilities for “effect seeking cause.”

To conduct risk analysis for the high-speed railway signaling system, it’s crucial to commence from the system equipment layer. This involves dissecting the structure and functionality of each module unit, computing pivotal reliability metrics like failure efficiency and pinpointing vulnerable areas within the system susceptible to severe consequences in case of failure. Specifically, employing FTA modeling aids in deducing failure propagation for specific fault events (base events) under defined conditions, outlining the logical connection between system failures and triggering factors. Simultaneously, by utilizing the Bayesian Network (BN) model, a directed graphical depiction of probability relationships is crafted, enabling both forward propagation and backward inference concerning uncertain knowledge of fault causality.

3.2 Risk evaluation method based on weighting evaluation

From a definition standpoint, risk assessment refers to acquiring the safety assurance level of an information system by identifying and assigning values to risk assets, threats and vulnerabilities (Roberts & Graves, 2020). Specifically, it involves qualitative or quantitative analysis of risk factors existing within the system and the potential for triggering incidents based on safety considerations. It primarily encompasses three aspects: system definition, risk analysis and risk evaluation, as detailed in Figure 2.

EN50126 (2017) defines railway signaling safety as a “non-intolerable risk,” while SIL specifies the safety integrity requirements allocated to safety-related systems (IEC 61508, 2010). In the high-speed railway signaling domain, safety-critical systems typically demand compliance with SIL 3 or SIL 4, e.g., trackside signaling equipment, cab signaling, etc. Non-safety-critical systems usually meet SIL 1 or SIL 2 requirements, like automatic train supervision (ATS), automatic train regulation (ATR), etc. The specific SIL allocations corresponding to requirements in the signaling systems are outlined in Table 1, while the risk assessment of signaling system vulnerabilities is based on the frequency-consequence matrix depicted in Table 2. Corresponding measures to eliminate associated risks are detailed in Table 3.

For risk evaluation, a crucial step lies in constructing an evaluation matrix aimed at obtaining the weights of various risk factors, enabling a comprehensive evaluation of complex and ambiguous information. Specific methodologies include AHP (Santarremigia, Molero, Poveda-Reyes, & Aguilar-Herrando, 2018), FAHP (Peng et al., 2021), gray relational analysis (GRA) (Wang, Wang, He, Bhamra, & Yang, 2021), artificial neural networks (ANN) (Na’amnh, Salim, Husti, & Daróczi, 2021), technique for order preference by similarity to an ideal solution (TOPSIS) (Seker, 2022), among others, each method presenting its own strengths and weaknesses. As outlined in Section 2.3, within the railway signal safety domain, widely applied methodologies like AHP (especially hierarchical analysis based on expert scoring) and its derivatives exhibit significant subjectivity in factor weighting, potentially leading to biases in computational outcomes.

In conclusion, to enhance the identification and assessment of safety risks associated with EMI, there should be a focus on algorithm design and innovative methods to quantitatively depict the correlation between EMI factors (the sources of electromagnetic risk) and high-speed railway signaling safety. Regarding this aspect, the authors addressed this by considering complex EMI in the high-speed railway environment as a risk factor impacting the safety performance of signaling equipment, conducting a series of theoretical analyses, algorithm designs and method innovations for risk assessment:

  1. Liu et al. (2022a, b) focused on the safety requirements and characteristics of railway signaling systems in the context of high-speed railways, clarifying the advantages and disadvantages of subjective weighting and objective weighting methods in assessing equipment failure modes/safety indicators after completing the identification of vulnerabilities and their risk analysis. Building upon the hierarchical analysis framework, a comprehensive weighting method based on the maximum residual absolute value method and entropy method is constructed (detailed in Figure 3). This approach aimed to balance the subjective biases in expert decisions while ensuring data rationality.

  2. Liu et al. (2022a, b) focuses on the complexity and diversity of signaling system failure modes in the context of high-speed railways. Recognizing deficiencies in traditional methods during practical application, it builds an ensemble learning model to develop an intelligent evaluation algorithm that reduces subjective and objective human biases, aiming to standardize and establish a risk assessment methodology based on fuzzy failure mode effects and criticality analysis (FMECA) (detailed in Figure 4).

  3. Liu and Yang (2022, 2023) target the research needs concerning the correlation between EMI and safety in the complex conditions of high-speed railway signaling, employing supervised machine learning, deep learning networks and text mining techniques to establish a knowledge graph of railway safety incidents (detailed in Figure 5). Ultimately, they propose a method based on linking knowledge entities and their relationships to achieve quantitative risk assessment. This approach differs from previous ones, which relied on improving algorithms based on expert decision data to reduce human biases in risk assessment. Instead, it efficiently and intelligently utilizes big data text mining techniques to extract valuable information and decision-making experiences from historical accident reports, offering a new perspective to enhance risk assessment in signaling safety.

4. Conclusion and reflection

When signaling equipment encounters EMI, not only leads to its own performance degradation but also potentially triggers risks that spread throughout the system, ultimately endangering train operation safety. To quantitatively characterize and predict the safety implications of EMI in high-speed railway signaling equipment and systems, this paper reviews relevant research and draws from experiences to construct a risk assessment methodology incorporating hazard identification and risk evaluation.

On this basis, suppressing or eliminating the subjective human factors affecting the accuracy of risk level prediction or the objectivity of safety decision-making is the subsequent focus in optimizing the risk assessment methodology and exploring the relationship between EMI and safety. Additionally, designing and developing a practical, versatile and operationally strong analysis platform tailored to the actual engineering needs in the context of high-speed railway operations is crucial to transitioning this research from theoretical innovation to engineering application.

Figures

CENELEC railway standard system

Figure 1

CENELEC railway standard system

Elements of risk assessment

Figure 2

Elements of risk assessment

Flow chart of comprehensive weighting algorithm

Figure 3

Flow chart of comprehensive weighting algorithm

Flow chart of fuzzy FMECA

Figure 4

Flow chart of fuzzy FMECA

A risk knowledge graph in railway safety (RKGRS) modeling scheme and process

Figure 5

A risk knowledge graph in railway safety (RKGRS) modeling scheme and process

SIL in railway signaling safety

Safety integrity levelSeverity level of hazard consequenceRailway accident levelProbability of failure on demand (dangerous failure rate/h)
SIL 1InsignificantGeneral accident of class D10–5
SIL 2MarginalGeneral accident of class C10–7
SIL 3CriticalGeneral accident of class A&B10–9
SIL 4CatastrophicExtremely major accidents & major accidents10–11

Note(s): 1. The railway signaling system risk assessment of hidden hazards is based on the “Typical Example of Risk Evaluation and Acceptance” (EN 50126, 2017)

2. The railway accident level is based on the “Performance Criteria of Immunity” (TB/T 3073, 2003)

Source(s): Author's own work

Frequency-consequence matrix for risk evaluation

FrequencyRisk levels
FrequentUndesirableIntolerableIntolerableIntolerable
ProbableTolerableUndesirableIntolerableIntolerable
OccasionalTolerableUndesirableUndesirableIntolerable
RemoteNegligibleTolerableUndesirableUndesirable
ImprobableNegligibleNegligibleTolerableTolerable
IncredibleNegligibleNegligibleNegligibleNegligible
InsignificantMarginalCriticalCatastrophe
Severity levels of hazard consequence

Source(s): Authors' own work

Qualitative risk categories

Risk categoryActions to be applied against each category
IntolerableShall be eliminated
UndesirableShall only be accepted when risk reduction is impracticable and with the agreement of the Railway Authority or the Safety
Regulatory Authority, as appropriate
TolerableAcceptable with adequate control and with the agreement of the
Railway Authority
NegligibleAcceptable with/without the agreement of the Railway Authority

Source(s): Authors' own work

References

CENELEC (2010). EN 50159-2010: Railway applications - communication, signalling and processing systems – safety related communication in transmission systems.

CENELEC (2011). EN 50128-2011: Railway applications - communication, signalling and processing systems - software for railway control and protection systems.

CENELEC (2017). EN 50126-2017: Railway applications - the specification and demonstration of reliability, availability, maintainability and safety (RAMS).

CENELEC (2018). EN 50129-2018: Railway applications - safety related electronic systems for signaling.

Chen, Y., Tian, Z., Hillmansen, S., Clive, R., & Ning, Z. (2020). DC traction power supply system reliability evaluation and robust design. 2019 IEEE 3rd International Electrical and Energy Conference (CIEEC) (pp. 11531158). IEEE, doi: 10.1109/CIEEC47146.2019.CIEEC-2019424.

Chu, Y. (2018). Research on reliability evaluation method of railway signal safety relays. Beijing: Beijing Jiaotong University.

International Electrotechnical Commission (2010). IEC 61508-2010: Functional safety of electrical/electronic/programmable electronic safety-related systems.

International Electrotechnical Commission (2017). IEC 60050-692-2017: International electrotechnical vocabulary (IEV) - Part 692: Generation, transmission and distribution of electrical energy - dependability and quality of service of electric power systems.

Lai, C., Zhong, Q., Zhao, Y., Qiu, Y., & Liu, G. (2021). Risk assessment method for electric shock of electrical equipment in low-voltage DC power supply system. Automation of Electric Power Systems, 45(19), 141147, doi: 10.7500/AEPS20210125002.

Li, Z., Jiang, Z., Wang, D., & Wang, Z. (2020). System modeling and fault tree analysis based on AltaRica [J]. IEEE Access, 8, 168879-168897. doi: 10.1109/ACCESS.2020.3022016.

Liu, J. (2017). Synthesized risk assessment method for railway safety based on FTA-AHP analysis. China Railway Science, 38(2), 138144, doi: 10.3969/j.issn.1001-4632.2017.02.21.

Liu, C., & Yang, S. (2022). Using text mining to establish knowledge graph from accident/incident reports in risk assessment. Expert Systems With Applications, 207, 117991, doi: 10.1016/j.eswa.2022.117991.

Liu, C., & Yang, S. (2023). A text mining-based approach for understanding Chinese railway incidents caused by electromagnetic interference. Engineering Applications of Artificial Intelligence, 117, 105598, doi: 10.1016/j.engappai.2022.105598.

Liu, C., Yang, S., Cui, Y., & Lv, J. (2020a). Quantitative analysis on coupling of traction current into cab signaling in electrified railways. Railway Engineering Science, 28(3), 275289, doi: 10.1007/s40534-020-00220-z.

Liu, C., Yang, S., Cui, Y., Lv, J., & Chen, B. (2021). Optimization method of switch jumper setting based on strategies for reducing conductive interference in railway. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 235(5), 644654. doi: 10.1177/0954409720951300.

Liu, C., Yang, S., Cui, Y., & Yang, Y. (2020b). An improved risk assessment method based on a comprehensive weighting algorithm in railway signaling safety analysis. Safety Science, 128, 104768, doi: 10.1016/j.ssci.2020.104768.

Liu, C., Yang, S., Chu, S., Wang, C., & Liu, R. (2022a). Application of ensemble learning and expert decision in fuzzy risk assessment of railway signaling safety. In 2022 IEEE 25th International Conference on Intelligent Transportation Systems (ITSC) (pp. 36913697), doi: 10.1109/ITSC55140.2022.9922049.

Liu, C., Yang, S., Zhao, H., Cui, Y., & Chu, S. (2022b). Research on radiated interference from diesel locomotive traction motor to cab signaling. IET Electrical Systems in Transportation, 12(3), 181196, doi: 10.1049/els2.12046.

Ministry of Railways of the People's Republic of China (2003). TB/T 3073-2003: EMC tests and limits for railway electrical signaling apparatus.

Musa, J. D. (1999). Software reliability engineering. New York: McGraw-Hill.

Na’amnh, S., Salim, M. B., Husti, I., & Daróczi, M. (2021). Using artificial neural network and fuzzy inference system based prediction to improve failure mode and effects analysis: A case study of the busbars production. Processes, 9(8), 1444, doi: 10.3390/pr9081444.

National Railway Administration of the People's Republic of China (2006). TB/T 3133-2006: Reliability, Availability, Maintainability and Safety (RAMS) of electronic products for railway rolling stock.

National Railway Administration of the People's Republic of China (2018a). TB/T 2468-2018: Evaluation methods of railway signal product reliability.

National Railway Administration of the People's Republic of China (2018b). TB/T 2615-2018: Fail-safe principle of railway signaling.

Standardization Administration of China (2008). GB/T 21562-2008: Railway applications-Specification and demonstration of reliability availability, maintainability and safety (RAMS).

Standardization Administration of China (2017). GB/T 20438-2017: Functional safety of electrical/electronic/programmable electronic safety-related systems - Part 3: Software requirements.

Peng, G., Han, L., Liu, Z., Guo, Y., Yan, J., & Jia, X. (2021). An application of fuzzy analytic hierarchy process in risk evaluation model. Frontiers in Psychology, 12, 715003, doi: 10.3389/fpsyg.2021.715003.

Roberts, D., & Graves, R. (2020). Risk assessment myth busters: Defining risk management processes and terminology. IEEE Industry Applications Magazine, 26(3), 2228, doi: 10.1109/MIAS.2019.2943642.

Santarremigia, F. E., Molero, G. D., Poveda-Reyes, S., & Aguilar-Herrando, J. (2018). Railway safety by designing the layout of inland terminals with dangerous goods connected with the rail transport system. Safety Science, 110, 206216, doi: 10.1016/j.ssci.2018.03.001.

Seker, S. (2022). A new model for risk assessment in glass manufacturing using risk matrix based IVIF-TOPSIS method. Journal of Intelligent & Fuzzy Systems, 42(1), 541550, doi: 10.3233/JIFS-219210.

Shi, G., Pu, J., Zhang, L., Geng, X., Zhou, Y., & Zhao, Y. (2020). Situation assessment based on multi-entity bayesian network. 2020 IEEE 16th International Conference on Control & Automation (ICCA) (pp. 702707). IEEE, doi: 10.1109/ICCA51439.2020.9264559.

Wang, R., & Yao, J. (2020). Remaining useful life prediction of CTCS-3 train control system based on risk index. Journal of the China Railway Society, 42(9), 8591, doi: 10.3969/j.issn.1001-8360.2020.09.011.

Wang, J. F., Wang, J. G., Roberts, C., Chen, L., & Zhang, Y. (2017). A novel train control approach to avoid rear-end collision based on geese migration principle. Safety Science, 91, 373380, doi: 10.1016/j.ssci.2016.08.025.

Wang, Z., Wang, M., He, R., Bhamra, R. S., & Yang, L. (2021). Gray relational analysis based assessment of escalator accident risk in subway stations. Journal of Intelligent & Fuzzy Systems, 41(3), 46194628, doi: 10.3233/JIFS-189722.

Wu, B., Cai, B., & Lu, D. (2019). An advanced reliability evaluation method for GNSS-based train localization unit. 2019 International Conference on Electromagnetics in Advanced Applications (ICEAA) (pp. 05580562). IEEE, doi: 10.1109/ICEAA.2019.8879062.

Yang, S., & Liu, C. (2023). Discrete modeling and calculation of traction return-current network for 400 km/h high-speed railway. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 237(4), 445457, doi: 10.1177/09544097221116966.

Yang, S., Yang, J., Cui, Y., & Pei, L. (2017). Study on the EMI impact over the safety of railway signaling and case analysis. 2017 2nd International Conference on System Reliability and Safety (ICSRS) (pp. 374379). IEEE, doi: 10.1109/ICSRS.2017.8272851.

Yang, S., Chen, B., Chen, H., Cui, Y., & Tang, Q. (2019). Suppression solutions to transient traction current interference in neutral zone for track circuit. Journal of Southwest Jiaotong University, 54(6), 13321341, doi: 10.3969/j.issn.0258-2724.20180692.

Zeng, Z., Bani-Mustafa, T., Flage, R., & Zio, E. (2020). An integrated risk index accounting for epistemic uncertainty in probability risk assessment. Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, 235(4), 711728, doi: 10.1177/1748006X20968954.

Zhang, Y., Bai, W., Shi, G., Zhang, Q., & Luo, X. (2021). Evaluation method of lithium battery safety based on thermal runaway risk index. Journal of Beijing University of Aeronautics and Astronautics, 47(5), 912918, doi: 10.13700/j.bh.1001-5965.2020.0077.

Zheng, S., Qin, Y., Wang, L., Jia, L., & Zheng, J. (2018). Bayesian network-based reliability analysis of high-speed train bogie system. In Proceedings of the 3rd International Conference on Electrical and Information Technologies for Rail Transportation (EITRT) 2017: Transportation (pp. 197204). EITRT, doi: 10.1007/978-981-10-7989-4_20.

Acknowledgements

This work was funded by the National Railway Administration of the People’s Republic of China (No: N2023G001) and Shaanxi Luyide Railroad and Bridge Technology Co., Ltd. (No: W22L00520).

Corresponding author

Shiwu Yang can be contacted at: ysw@bjtu.edu.cn

Related articles