Operational performance improvement in manual assembly lines: a case study in Denmark and conceptual model for quick and long-term wins
International Journal of Productivity and Performance Management
ISSN: 1741-0401
Article publication date: 1 September 2023
Issue publication date: 26 June 2024
Abstract
Purpose
This study aims to investigate how to identify and address production levelling problems in assembly lines utilising an intensive manual workforce when higher productivity levels are urgently requested to meet market demands.
Design/methodology/approach
A mixed-methods approach was used in the research design, integrating case study analysis, interviews and qualitative/quantitative data collection and analysis. The methodology implemented also introduces to the literature on operational performance a novel combination of data analysis methods by introducing the use of the Natural Language Understanding (NLU) methods.
Findings
First, the findings unveil the impacts on operational performance that transportation, limited documentation and waiting times play in assembly lines composed of an intensive workforce. Second, the paper unveils the understanding of the role that a limited understanding of how the assembly line functions play in productivity. Finally, the authors provide actionable insights into the levelling problems in manual assembly lines.
Practical implications
This research supports industries operating assembly lines with intensive utilisation of manual workforce to improve operational performance. The paper also proposed a novel conceptual model prescriptively guiding quick and long-term improvements in intensive manual workforce assembly lines. The article assists industrial decision-makers with subsequent turnaround strategies to ensure higher efficiency levels requested by the market.
Originality/value
The paper offers actionable findings relevant to other manual assembly lines utilising an intensive workforce looking to improve operational performance. Some of the methods and strategies examined in this study to improve productivity require minimal capital investments. Lastly, the study contributes to the empirical literature by identifying production levelling problems in a real context.
Keywords
Citation
de Jesus Pacheco, D.A. and Schougaard, T. (2024), "Operational performance improvement in manual assembly lines: a case study in Denmark and conceptual model for quick and long-term wins", International Journal of Productivity and Performance Management, Vol. 73 No. 6, pp. 1689-1718. https://doi.org/10.1108/IJPPM-11-2022-0566
Publisher
:Emerald Publishing Limited
Copyright © 2023, Emerald Publishing Limited