To read this content please select one of the options below:

Lean manufacturing for reducing lead time in foundry processes: a design science approach

Juliano Endrigo Sordan (Department of Industrial Engineering, Universidade Federal de São Carlos – UFSCar, São Carlos, Brazil and Department of Production Management, College of Technology of São Paulo, Sertaozinho, Brazil)
Pedro Carlos Oprime (Department of Industrial Engineering, Universidade Federal de São Carlos, São Carlos, Brazil)
José Leonardo Ferreira (Department of Production Management, College of Technology of São Paulo, Sertaozinho, Brazil)
Clesio Aparecido Marinho (Department of Production Management, College of Technology of São Paulo, Sertaozinho, Brazil)
Arminda Pata (Department of Industrial Engineering, ISDOM, Marinha Grande, Portugal)

International Journal of Lean Six Sigma

ISSN: 2040-4166

Article publication date: 9 July 2024

6

Abstract

Purpose

The lean manufacturing (LM) approach is a highly effective method that can be implemented in any industry to streamline production processes, meet customer demand and eliminate any unnecessary waste. This paper aims to propose and evaluate a generic project-based framework grounded on the LM approach for reducing lead time in foundry processes.

Design/methodology/approach

Using design science research (DSR), we developed a generic LM project-based framework for reducing lead time in foundry processes.

Findings

The developed framework provides an alternative method to implement LM projects to reduce lead time and nonvalue activities in foundry factories.

Practical implications

The findings of this research can guide better lean practitioners for lead time reduction in foundry processes.

Originality/value

This paper contributes to the operational excellence literature when discussing the impact of the LM approach on foundry processes. In addition, the paper provides a roadmap for reducing lead time in a foundry company.

Keywords

Citation

Sordan, J.E.E., Oprime, P.C., Ferreira, J.L., Marinho, C.A. and Pata, A. (2024), "Lean manufacturing for reducing lead time in foundry processes: a design science approach", International Journal of Lean Six Sigma, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/IJLSS-01-2024-0018

Publisher

:

Emerald Publishing Limited

Copyright © 2024, Emerald Publishing Limited

Related articles