To read this content please select one of the options below:

ERP implementation at ABC mining company

Madhavi Nandi (Information Technology and Systems Management, University of South Carolina Sumter, Sumter, South Carolina, USA)
Santosh Nandi (Business Administration and Economics, University of South Carolina Sumter, Sumter, South Carolina, USA)

Publication date: 27 February 2021

Abstract

Learning outcomes

After reading and discussing this case, students will learn to identify the content and context of enterprise resource planning (ERP) implementation that is important from an operations standpoint. Through this case, student will discuss and evaluate the scenarios of ERP implementation arising from different deployment alternatives. Students will also learn to comprehend the case organization’s unique operational context and explore the challenges of introducing change into workplace environment and stakeholders’ overall expectations.

Case overview/synopsis

This case introduces students to the dilemmas of managerial decision-making that large companies face while implementing organization-wide technological upgrades, such as ERP. The case is set at a time point where ABC Mining Company – a large public-sector mining company – was trying to identify the most optimal ERP option based on its organizational structure and organizational processes. The information related to ABC’s organizational context included their business, structural and operational scenarios at the time. The information related to ABC’s stakeholders’ expectations reflected their perception about ERP and future implications. The information related to managerial conflicts reflected the understandings of the managers, in terms of need for ERP, needed skill to handle ERP and different types of ERP implementations that others have adopted. The case calls students for extensive analysis of the gathered information to identify and evaluate impacts and risks of all possible ERP alternates, and finally pick upon the most optimal ERP alternate. The case assumes a live 90-min class session conducted by an instructor. The instructor is recommended to assign the case to students for mandatory pre-reading before coming to class. The instructor is provided with a teaching plan to navigate the case.

Complexity academic level

The case is designed as an introductory case for an undergraduate or a graduate course pertaining strategic decision-making of ERP systems implementation.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 11: Strategy.

Keywords

Acknowledgements

Disclaimer. This case is written solely for educational purposes and is not intended to represent successful or unsuccessful managerial decision-making. The authors may have disguised names; financial and other recognizable information to protect confidentiality.

Citation

Nandi, M. and Nandi, S. (2021), "ERP implementation at ABC mining company", , Vol. 11 No. 1. https://doi.org/10.1108/EEMCS-04-2020-0133

Publisher

:

Emerald Publishing Limited

Copyright © 2021, Emerald Publishing Limited

Related articles