To read this content please select one of the options below:

Interactive roles of megaproject governance mechanisms and their effects on governance performance

Lan Luo (Nanchang University, Nanchang, China)
Yuyang Liu (Nanchang University, Nanchang, China)
Yue Yang (Nanchang University, Nanchang, China)
Jianxun Xie (College of Civil Engineering and Architecture, Jiaxing University, Jiaxing, China)
Guangdong Wu (School of Public Affairs, Chongqing University, Chongqing, China)

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Article publication date: 4 July 2024

56

Abstract

Purpose

This study aims to explore the interaction of “contractual governance – relational governance – governmental governance” mechanisms and proposes hypotheses about the effects of megaproject governance on governance performance from both theoretical and practical perspectives.

Design/methodology/approach

In this paper, a megaproject governance model is developed to explain the relationship between governance mechanisms and governance performance. The model is based on related literature and explores the interactions between governance mechanisms and how they work to improve governance performance. The structural equation model (SEM) is adopted to explore the influence path on governance performance for megaprojects.

Findings

The results indicate that: (a) The findings highlight the positive role of project governance mechanisms on governance performance. (b) Contractual governance, relational governance, and governmental governance directly affect governance performance. In addition, contractual governance mediates governance performance through relational governance and governmental governance; governmental governance mediates governance performance through contractual governance and relational governance. (c) Contractual governance, relational governance, and governmental governance play a positive role in governance performance.

Research limitations/implications

Governmental governance is added to project governance theory and the empirical research method is used to explore the interaction between contractual governance, relational governance, and governmental governance of megaprojects. The SEM is used to systematically explore the paths of megaproject governance mechanisms on governance performance, considering the interactive role of the “contractual governance - relational governance - governmental governance” and the mediating role.

Practical implications

The study reveals the impact path of multidimensional megaproject governance mechanisms on governance performance. In this paper, the empirical findings can help the project participants by providing a decision-making basis for good governance and references for the governments to promote the construction of a micro-institutional environment for megaprojects.

Originality/value

The contributions of this study are (1) to add an exploration of governmental governance to the existing project governance theory, and (2) to consider the interactions of the “contractual governance – relational governance – governmental governance” mechanisms, and (3) to explore their effects on governance performance, including direct and mediating effects. This study contributes to a comprehensive understanding of megaproject governance by considering governmental governance and the interactions of the three governance mechanisms. Understanding the impact of megaproject governance on governance performance could assist project stakeholders and provide decision guidance for good governance.

Keywords

Acknowledgements

This research is funded by the National Natural Science Foundation of China [71901113, 72061025, 71962019 and 71972018], the Natural Science Foundation of Jiangxi Province in China [20212ACB214014 and 20232BAB204076], and the China Scholarship Council Project [202306820029].

Citation

Luo, L., Liu, Y., Yang, Y., Xie, J. and Wu, G. (2024), "Interactive roles of megaproject governance mechanisms and their effects on governance performance", Engineering, Construction and Architectural Management, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/ECAM-10-2023-1081

Publisher

:

Emerald Publishing Limited

Copyright © 2024, Emerald Publishing Limited

Related articles