Abstract
Purpose
The purpose of this paper is to focus on the identification of the existing capacities of post disaster C & D waste management in developing countries, with a special emphasis on Sri Lanka to determine the capacity gaps and related influencing factors.
Design/methodology/approach
Multiple case studies and expert interviews were conducted to gather primary information on the existing capacities of disaster C & D waste management. Three case studies, including 15 individuals and six experts representing government, non-government institutions and others, were selected.
Findings
The results revealed the existing capacities, capacity gaps and influencing factors for post disaster C & D waste management in the areas of skills and confidence building, links and collaborations, continuity and sustainability, research and development, communication and coordination, organisational implementation and investment in infrastructure.
Research limitations/implications
This study limited disaster C & D waste to debris generated from totally or partially damaged buildings and infrastructure as a direct impact of natural disasters or from demolished buildings and infrastructure at rehabilitation or at early recovery stages.
Originality/value
The research enabled an analysis of existing capacities and identified capacity gaps in post disaster C & D waste management with influencing factors developing countries.
Keywords
Citation
Karunasena, G. and Amaratunga, D. (2015), "Capacity gaps in post disaster construction & demolition waste management", Engineering, Construction and Architectural Management, Vol. 22 No. 4, pp. 446-466. https://doi.org/10.1108/ECAM-08-2014-0107
Publisher
:Emerald Group Publishing Limited
Copyright © 2015, Emerald Group Publishing Limited