A green project scheduling with material ordering problem considering cost constraints and quality of materials

Omid Kebriyaii (MAPNA Group, Tehran, Iran)
Ali Heidari (Department of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran)
Mohammad Khalilzadeh (CENTRUM Católica Graduate Business School, Lima, Peru) (Pontificia Universidad Católica del Perú, Lima, Peru)
Dragan Pamucar (Department of Operations Research and Statistics, Faculty of Organizational Sciences, University of Belgrade, Belgrade, Serbia) (College of Engineering, Yuan Ze University, Taoyuan City, Taiwan)

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Article publication date: 18 June 2024

59

Abstract

Purpose

Integrating project scheduling and material ordering problems is vital in realistically estimating project cost and duration. Also, the quality level of materials is important as one of the key project success factors.

Design/methodology/approach

In this paper, a three-objective mathematical model is presented for green project scheduling with materials ordering problems considering rental resources. The first objective is to minimize the total cost of the project site and logistics. The second objective is to minimize the environmental impacts of producing materials and the third objective is to maximize the total quality of materials. Since costs trigger several challenges in projects, cost constraints are considered in this model for the first time and also the cost of delay in supplying of materials by the suppliers has been deducted from the project costs. Subsequently, the model was implemented in a real case and solved by the Lagrangian Relaxation algorithm as an exact method on GAMS software for model validation.

Findings

Based on sensitivity analysis of some parameters, the findings indicate that the cost constraint and lead time have considerable effects on the project duration. Also, integrating project scheduling and material ordering improves the robustness of the project schedule.

Originality/value

The primary contributions of the present research can be stated as follows: considering the cost constraints in the project scheduling with material ordering problem, incorporating the rental resources and taking the quality levels of materials as well as the environmental impacts into account.

Keywords

Acknowledgements

This research was supported by MAPNA Group.

Citation

Kebriyaii, O., Heidari, A., Khalilzadeh, M. and Pamucar, D. (2024), "A green project scheduling with material ordering problem considering cost constraints and quality of materials", Engineering, Construction and Architectural Management, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/ECAM-01-2024-0004

Publisher

:

Emerald Publishing Limited

Copyright © 2024, Emerald Publishing Limited

Related articles