A strategy for reducing construction waste generated during the design process in architectural design firms in Egypt

Ayman Ahmed Ezzat Othman (Architectural Engineering Department, The British University in Egypt (BUE), El-Sherouk City, Egypt)
Aya Said Muawad Saad (Architectural Engineering Department, The British University in Egypt (BUE), El-Sherouk City, Egypt)

Construction Innovation

ISSN: 1471-4175

Article publication date: 9 July 2024

18

Abstract

Purpose

This paper aims to develop and validate a strategy for reducing construction waste (CW) generated during the design process (DP) in architectural design firms (ADFs) in Egypt.

Design/methodology/approach

Qualitative and quantitative research methodology was designed to accomplish four objectives. The literature review investigated DP, CW, waste management (WM) and WM strategies (WMS). Three case studies were analysed to investigate the role of WMS towards reducing CW during DP. A survey questionnaire was conducted with a representative sample of ADFs in Egypt to assess their perception and application of WMS during DP. Lastly, a strategy was developed and validated to reduce CW generated during DP.

Findings

Through literature review, the research identified the highest 40 causes of CW during the DP and classified them into 13 categories. Despite early promotion of WMS to reduce CW at its source, Egypt and other countries with similar construction market characteristics lack laws and regulations to address CW during the DP, with current codes primarily focusing on post-occurrence issues. In addition, analysis of three case studies showed that CW was reduced by adopting WMS during the DP. Findings of data analysis revealed that ADFs have an average knowledge of WMS and a low awareness of Egyptian laws and WMS during DP. “Prefabrication” was the highest-ranked strategy for CW reduction during DP. Several challenges hamper the implementation of WMS. The “preparation and briefing” was ranked the most common design stage where CW causes occur, while “waiting” was ranked the most common form of CW. These findings informed the research outcome and helped in the development of the proposed strategy.

Research limitations/implications

The proposed strategy was developed taking into account the results of the survey questionnaire which was conducted in ADFs in Egypt where the authors reside, and such a strategy is needed. However, it could be applied in other countries that share the same characteristics of the architectural DP as well as the causes of CW and WMS implementation challenges.

Practical implications

This research presents a practical strategy to reduce CW generated during the DP. It was based on the findings of literature review, case studies and survey questionnaire. The strategy was explained in a workable way to include the required activities; tools and techniques; involved personnel and needed resources. The strategy was validated by a representative sample of ADFs in Egypt to ensure its practicability and viability for implementation towards developing a sustainable built environment. The practical application of the strategy will have long-term and short-term benefits. The long-term benefits include improving the social, economic and environmental aspects of sustainability during the design and construction phases in Egypt. In the short term, application of the strategy will improve the cooperation between design and construction teams, reduce the negative impact of CW production and enhance the quality of construction projects in Egypt.

Originality/value

Despite the need to reduce CW during DP, a practical strategy is lacking in Egypt, where laws are focused on dealing with CW after its existence. This research studied a topic that received scant attention in construction literature. It developed and validated a strategy to reduce CW during DP, which represents a synthesis that is novel and creative in thought and adds value in a manner that has not been previously explored.

Keywords

Citation

Othman, A.A.E. and Saad, A.S.M. (2024), "A strategy for reducing construction waste generated during the design process in architectural design firms in Egypt", Construction Innovation, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/CI-08-2023-0202