Assessing maintenance budget elements for building maintenance management in Nigerian built environment: a Delphi study

Babatunde Fatai Ogunbayo (CIDB Centre of Excellence and Sustainable Human Settlement and Construction Research Centre, Faculty of Engineering and the Built Environment, University of Johannesburg, Johannesburg, South Africa)
Clinton Ohis Aigbavboa (CIDB Centre of Excellence and Sustainable Human Settlement and Construction Research Centre, Faculty of Engineering and the Built Environment, University of Johannesburg, Johannesburg, South Africa)
Wellington Didibhuku Thwala (Department of Civil Engineering, College of Science, Engineering and Technology, University of South Africa (UNISA), Pretoria, South Africa)
Opeoluwa Israel Akinradewo (CIDB Centre of Excellence and Sustainable Human Settlement and Construction Research Centre, Faculty of Engineering and the Built Environment, University of Johannesburg, Johannesburg, South Africa)

Built Environment Project and Asset Management

ISSN: 2044-124X

Article publication date: 25 January 2022

Issue publication date: 8 June 2022

2088

Abstract

Purpose

A maintenance budget is an element of maintenance management (MM) that deals with financial planning for maintenance operations and execution within a maintenance organisation. Developed countries have standardised MM structures which guides maintenance activities. This, however, cannot be said of developing countries, as there are few or no MM standards adopted. Given this contextual setting, the study aims to validate the relevance of maintenance budget (MB) elements utilised in developed countries for developing countries – using Nigeria as a case study exemplar. Also, the study further examines the effectiveness of the validated maintenance budget elements.

Design/methodology/approach

The research adopts qualitative techniques and employs the Delphi survey to collect and analyse primary data from an operational perception through structured questionnaires to solicit views from panellists on the subject being assessed. A relative importance index (RII) was used in measuring consensus for the Delphi study outcomes, while a Cronbach Alpha test was carried out on all the MB elements to determine their level of reliability.

Findings

The key finding from the study reveals that of the 21 elements that influence the implementation of MB, 10 elements have a very high influence on the MM of buildings (VHI: 9.00–10.00), 5 elements had a high influence (HI: 7.00–8.99) and 6 other elements scored medium impact (MI: 5.00–6.99). The elements of MB that recorded very high influence on prompt MM effectiveness include MB implementation, corruption-free maintenance process, reduction in maintenance expenditure, maintenance financial plan, cost implication of maintained asset, cash flow indexing, prioritisation of maintenance financing, maintenance funding, incorporation of financial indicators and audit of operational maintenance cost.

Practical implications

On a practical note, these elements will guide the built environment professionals in organising maintenance activities to best use limited resources.

Originality/value

Cumulatively, the research presented shows that these elements are similar to those of other countries. Effective MM of buildings is assured when these elements are integral to developing a MB.

Keywords

Citation

Ogunbayo, B.F., Ohis Aigbavboa, C., Thwala, W.D. and Akinradewo, O.I. (2022), "Assessing maintenance budget elements for building maintenance management in Nigerian built environment: a Delphi study", Built Environment Project and Asset Management, Vol. 12 No. 4, pp. 649-666. https://doi.org/10.1108/BEPAM-06-2021-0080

Publisher

:

Emerald Publishing Limited

Copyright © 2022, Babatunde Fatai Ogunbayo, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Opeoluwa Israel Akinradewo

License

Published by Emerald Publishing Limited. This article is published under the Creative Commons Attribution (CC BY 4.0) licence. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this licence may be seen at http://creativecommons.org/licences/by/4.0/legalcode


Introduction

Maintenance is an action carried out to restore or retain a structure to an acceptable standard through combining all management, technical and administration in the maintenance process and operations (EN 13306, 2001). Regardless of the required budget for maintenance operations, it cannot be abandoned (Ogunbayo and Aigbavboa, 2019). According to Mohd-Noor et al. (2011), budgeting for successful MM operations is a key factor of progression in maintenance organisations. Like other key performance indicators of MM, budgeting supports all maintenance operations and processes (Ahzahar et al., 2011; Omar et al., 2017). Omar et al. (2017) observed that the success of maintenance operations could be affected by lack of budget. Srivastava et al. (2020) stated that a proper budget is crucial for maintenance organisations to sustain operational effectiveness. In this study, MM is proxies by several variables – namely organisational maintenance policy, human resources management, personnel training, monitoring and supervision, task planning and scheduling, maintenance information system, maintenance approach, spare part management, outsourcing strategy and continuous improvement benchmarks against maintenance (Pantzartzis et al., 2016; Srivastava et al., 2020).

MB, according to Srivastava et al. (2020), is a driver for maintenance operations and processes. It is an estimate for maintenance operations in advance of the period which it applies (Srivastava et al., 2020). As one of the core elements of MM, MB guides required estimates for manpower, spare parts, consumables and other operations expenses towards bringing efficiency and economy in the maintenance operations (Hastings, 2015; Arumsari and Rarasati, 2017). In this study, MB encapsulates the prioritisation of maintenance financing, valuation of maintenance operation budget, maintenance operation financing and other activities undertaken by the maintenance department of the public organisation that deals with financial planning for maintenance operations and execution.

According to Alsyouf (2006), an adequate MB will impact the building maintenance process. Srivastava et al. (2020) postulated that a well-defined MB ensures optimal maintenance operation and process towards efficient productivity and profitability. It is worthy of note that there were fewer studies carried out focussing on the scope of MB elements for the MM of buildings in developing countries, including Nigeria (Alsyouf, 2006, Ling and Formoso, 2014; Hastings, 2015). Hence, this study aims to affirm whether the elements of MB found in other countries (developed) that influence MM of buildings are significant in the maintenance of buildings within the developing countries using the Nigerian Built Environment (NBE) as a case study. It is important to note that MB elements are industry, organisational and country context. Therefore, depending on the laws, economic, political factors and organisational system, different information procedures might or might not be relevant in MB development in a particular country. Equally, depending on the elements of MB that impacted maintenance of buildings, assuming some industries, organisations and national settings to be in the same direction with the NBE will be a great distortion. However, some developed countries' organisations and industries still share a resemblance with developing countries' context. As a result, it is essential to empirically ascertain the elements of the MB that influence the MM of buildings in developing countries. Therefore, the main objective of this study is to identify elements of the MB that influence MM of buildings in developing countries and determine the extent to which each element influences building MM using the NBE as a case study.

Literature review

MB attributes: a relevant survey of existing literature

In the maintenance process, different MB types are prepared by organisations for different maintenance activities. One major aim of MB is that it is prepared to bring about economic relief and efficiency in the maintenance activities (Odent and Berthellemy, 2002). Further, some difficulties might exist in determining what to budget in maintenance activities because maintenance is not an exact science and deterioration patterns cannot be forecasted accurately (Odent and Berthellemy, 2002). Nevertheless, Mohd-Noora et al. (2011) stated that researchers define MB in several ways, from different perspectives, due to the importance of running proper maintenance activities. One important aspect of MB maintenance is that it is a key factor of progression that influences the financial planning of maintenance operation in a maintenance organisation (Wireman, 2005; Ahzahar et al., 2011). Although researchers have identified different elements for MB, maintenance organisations in the built industry explore every prospect to improve MB towards profitability and achieve cost savings for their organisation. Researchers have expressed diverse views regarding the explicit elements that constitute MB since the inception of MB studies. Omar et al. (2017) noted that these depend on maintenance funding, optimisation of business profitability financial planning, annual budget, maintenance operation system improvement, corruption-free maintenance process, maintenance materials assessment and incorporation of financial indicators. The early studies on maintenance by Campbell (1995) and Wireman (2005) and affirmed by Puķīte and Geipele (2017) more recently show that elements of MB contain cost control for labour, cost of monitoring the contractor and market and financial terms of operations. Ismail (2014) and Puķīte and Geipele (2017) postulated that MB elements also include prioritisation of maintenance financing, valuation of maintenance operation budget, maintenance operation financing, optimising maintenance resources and MB implementation. Ahzahar et al. (2011) emphasised that in designing MB for maintenance activities, there is a need to consider elements based on the factors as follows: better asset replacement planning, certainties in yearly MBs and financial plans. Also, in designing MB elements, Ahzahar et al. (2011) stated that annual MB planning, reduction in organisation maintenance expenditure and optimisation of maintenance financing outsourcing should be considered. Karia et al. (2014) identified the following elements as important in the MB development: maintenance operation system improvement, corruption-free maintenance process, maintenance materials assessment, maintenance funding, better asset replacement planning, certainties in yearly MBs, and operational maintenance auditing. Marquez and Gupta (2006) identified the cost of lost production, labour costs, cost of spare parts, cost of providing information systems, cost of human resources to support the programme and equipment/line/plant production lost cost as the core element of MB. Of recent, the study of Srivastava et al. (2020) indicated that the MB is one of the basic parts of the MM function and includes elements such as analysis of damage cost, maintenance operation system improvement, corruption-free maintenance process, and maintenance materials assessment. Mekasha (2018) identified the cost of an asset for its entire life span, failure rate cost, cost of spares, personnel cost, repair times, and components costs as an important element of the MB.

Moreover, Mohd-Noor et al. (2011) proclaimed that for effective and cost efficiency elements of MB will include audit of operational maintenance cost, yearly MBs certainties, cash flow indexing, planning for future asset replacement, the cost implication of maintained asset, reduction in maintenance expenditure and maintenance financial plan. Flores-Colen and Jorge (2010) postulated that MB elements would include maintenance operation system improvement, incorporation of financial indicators and optimisation of business profitability. Flores-Colen and Jorge (2010) stated that the MB elements would also contain maintenance funding, maintenance materials assessment, corruption-free maintenance process, prioritisation of maintenance financing and valuation of maintenance operation budget. The elements submitted by Pinjala et al. (2006) include market and financial terms of operations, MB implementation, assets maintenance prioritisation, cash flow indexing and planning for future asset replacement and cost implication of maintained asset. Also, Spedding (1987), Hamid et al. (2007) and Mohd-Noor et al. (2011) stated that elements of MB should be determined based on the type and implementation strategy of maintenance activities guided by the maintenance policy of the organisation.

Theoretical background

In explaining the elements of the MB, both the input-output model (Visser, 1998) and the decision-making model (Pintelon and Gelders, 1992) were engaged. Visser (1998)'s input-output maintenance model showed that an adequate MB is derived for maintenance activities as shown in Figure 1 and highlighted below through:

  1. MB planning (input);

  2. Organisation efficiency (process) and

  3. Maintenance operation effectiveness (output).

As noted by Visser (1998), the input-output maintenance model showed that budget within a maintenance system of an organisation is a transformation process encapsulated in an enterprise system based on input and output processes (see Figure 1). The inputs process includes material, labour, spares, information, tools, money and external services needed to achieve the desired level of effective MM. At the same time, the expected output (maintenance operation effectiveness) from the planning includes maintainability, profits, availability, safety and result-oriented output. Moreover, in achieving the expected output, there is a need for organisation efficiency through efficient production and maintenance system. Visser (1998) maintains the need for external resources to prepare the MB (see Figure 1). The input-output model detailed how maintenance activities will influence the MB for the cost of work, quality of work, availability of the facility and safety of the maintenance operation (Visser, 1998). Through this process, the profitability of the maintenance organisation would conveniently be guided (Visser, 1998; Tang, 2002).

Likewise, the decision-making model, as advanced by Pintelon and Gelders (1992), showed that an adequate MB is derived for maintenance activities as shown in Figure 2 through:

  1. design effective management system;

  2. capacity for financial decision-making and

  3. provision of toolkit to support failure (techniques/actions/policies).

Further, Pintelon and Gelders (1992) suggested that the decision-making MM model consists of three stages: maintenance system design, MM decision-making capacity and MM toolkit. The first stage of the model underlined the need for key decisions on MB to be guided by broader business context through a better interaction system among the maintenance organisation's marketing, finance and operation units. The second stage of the model emphasised the importance of budget planning and control that guide the decision of maintenance managers on major business functions (finance, operation and marketing), resources management and performance output. The third stage, which is the final stage, showed the need for statistical tools to support the occurrence of failures in the MB planning and control statistically. It also highlights the need for other tools to help optimise maintenance actions and policies.

As shown in Figures 1 and 2, a fair MB derived based on both models will nurture maintenance organisation to a strategical position in developing a MB suitable for executing maintenance operations and processes (Marquez and Gupta, 2006; Marquez, 2007; Alzaben, 2015; Mekasha, 2018). The built environment as a whole, particularly building and facility management organisations in Nigeria, is no exemption. Moreover, the combined model strength defines the maintenance planning, organisation efficiency and capacity for financial decision-making towards the development of MB for maintenance activities within the maintenance organisation (Marquez and Gupta, 2006; Marquez, 2007; Alzaben, 2015; Mekasha, 2018). However, it could be deduced from the above literature reviewed that MB influences building MM (Lind and Muyingo, 2012; Puķīte and Gelders, 2017; Pintelon and Muchiri, 2009). Nonetheless, in researchers' opinion on the specific elements that constitute MB, there seem to be varying views.

Consequently, to guide this study, a synthesis in the current study of the views developed by the various authors provides a more holistic framework. Hence, detailed in Table 1 were the elements of the MB theoretical concept that guided the current study. These elements, as seen in the literature reviewed, represent the views different studies have advocated predominantly.

Methodology

In assessing the elements of MB for the MM of buildings in Nigeria's built environment, this study adopted the Delphi survey technique (Aigbavboa, 2014; Ameyaw et al., 2016). According to Linstone and Turoff (1975), the Delphi method is a structured communication method developed as a systematic, interactive forecasting method that depends on a panel of experts. Rowe and Wright (2001) postulated that the Delphi method believes that forecasts from a structured group are more accurate than those from unstructured groups. Ameyaw et al. (2016) believed that Delphi's group judgement output is more accurate than individual judgements. Tilakasiri (2015) recommended the Delphi technique for the development of concepts, standards, frameworks or models for a study. With contemporary construction management literature, this method has been used extensively within the built environment studies, for instance, by Aghimien et al. (2021) to assess challenges applicable to the South Africa construction industry; Aliu et al. (2021a) examine undergraduate courses relevant to the built environment in the Fourth Industrial Revolution (4IR) era and Aliu et al. (2021b) used it to examine the 21st-century employability skill improvement framework for the construction industry. As demonstrated by the body of knowledge, the Delphi survey techniques adopted for this study provide a robust epistemology approach and consist of a more accurate group judgement output than individual judgements. However, the study employed the Delphi technique to collect and analyse primary data from an operational perception. As affirmed by Rowe and Wright (2001) and Fletcher and Marchildon (2014) and Somiah et al. (2020), Delphi is useable for both qualitative and quantitative studies and includes the use of structured questionnaires to solicit views from panellists. According to Leung (2001), this will be achieved through iterative rounds until saturation occurs, at which point participants converge on the correct (most exact) response. Also, Aigbavboa (2014) asserted that Delphi survey usage is effective, robust and suitable tool for capturing vital data in qualitative studies. Hence, this qualitative study adapted and employed the Delphi process as described in Figure 3.

The first step of the Delphi in this study was reviewing the relevant literature, through which relevant MB elements that influenced MM of buildings were identified. For Delphi's survey of this study, the second step was the expert selection. The experts were prudently selected based on recommendations of (Loo, 2002; Somiah et al., 2020), and their opinion represents a broad spectrum on the subject being assessed. Thus, for this study, experts were mainly drawn from both industry and academia. Also, the selection criteria of experts for this study were based on Aigbavboa (2014) suggestion, which detailed that experts' practical experience and theoretical knowledge are significant in their selection. At the beginning of the study, 30 experts freely responded to be part of the Delphi study through emails. These emails were gotten through their related professional bodies and online academic profiles. However, 15 experts could not continue with the study due to their busy schedules and other personal commitments. This was written in their response to the author during round one of the Delphi study. In all, for both rounds one and two of the Delphi study, only 15 experts partook. Nonetheless, the Delphi process ended after round two when a strong consensus was achieved. In the Delphi study, according to Hsu and Sandford (2007), the sample size as a representation of a population is not reliant on a statistical sample but on bringing together experts to share their knowledge and experience in the study area. Therefore, as guided by previous studies within the subject under study (Hsu and Sandford, 2007; Aigbavboa, 2014), a sample size of 15 experts was used for this study due to the heterogeneous nature of the selected panellists. Delbecq et al. (1975) noted that expert panellists of between 10 and 15 are adequate for a Delphi study provided the background of the expert panellists is homogeneous. Subsequently, for rounds one and two of the Delphi survey, instructions and questionnaires were sent to the 15 expert panellists selected. Table 2 showed clearly that the demographic profile of the expert in relation to MB development for MM of buildings had the required essential knowledge and experience.

Also, a checklist was developed for the study, and this helped in creating a benchmark for the panel of experts' selection for the Delphi study (see Appendix). Through the checklist designed, an expert panel member for the study must obtain a minimum of five points to qualify to join the Delphi study. However, all the selected 15 panels of experts obtained the minimum requirement of five points required for this study, and they were considered fit for the study. Additionally, in developing the questionnaire for the Delphi study, a rigorous literature review was carried out. Moreover, the questionnaire quality (clarity, transparency and completion period amongst others) was tested through a pilot study.

Similarly, feedbacks gotten from the pilot study was incorporated before the final questionnaire was produced. As postulated by Pallant (2007) and Rehbinder (2011), in order to create a reliable construct of multiple variables, a scale with a Cronbach's alpha higher than 0.7 is required; hence, a Cronbach alpha test was carried out on all the MB elements to determine their level of reliability. The Cronbach's alpha value for all the MB elements was 0.719. This shows that the data collection instrument is reliable, and the responses obtained from it can be relied upon to be valid (Pallant, 2007). Likewise, the use of a combination of the mean (M), median (x¯), interquartile deviation (IQD) and standard deviation (σx) based on RII earlier used in similar studies such as Aigbavboa (2014) and Somiah et al. (2020) were employed in the analysis and determining consensus in responses of experts. Therefore, the consensus for the study was measured as detailed in Table 3.

As shown in Table 3, the consensus for the Delphi study was based on 10-points impact scale where 1 to 2 signify no influence; 3 to 4 signify low influence; 5 to 6 signify medium influence; 7 to 8 signify high impact and 10 signify very high impact. In addressing the issue of generalisation, reliability and validation of results, the Delphi findings for this study are all-encompassing theoretical reasoning and rigorousness of the data collection process (Sarantakos, 2005; Somiah et al., 2020). As shown in Figure 4, the methodological structure this study adopted was underpinned by the input-output MM model (Visser, 1998) and the decision-making MM model (Pintelon and Gelders, 1992). Similarly, through the chance provided for the experts to maintain or freely effect changes to their response based on good reasons for the latter, and through tenacious individual communication with experts, internal validity for the study was asserted. Further, as theorised by Ameyaw et al. (2016), structured questionnaires were used in soliciting data from the panellist for this study. Also, through the use of IQD, mean, median and σx for the study was calculated and analysed for each Delphi survey round based on the estimated statistical view of the expert panellist. In line with the ethical consideration for the study, throughout the Delphi study process, the experts' identity was kept confidential.

Results

Delphi study round one result

The round one Delphi survey for this study is intended to affirm the MB elements that influence the MM of buildings in the NBE. As shown in Figure 4, eighteen (18) elements of MB during round one of the surveys identified through a literature review were validated by panellists to have influenced the MM of buildings in the NBE. Similarly, expert panellists were given opportunities to suggest new elements that may influence MB that the questionnaire might not include. Further, out of the 18 elements identified, 8 elements, namely MB implementation, reduction in maintenance expenditure, maintenance financial plan, the cost implication of maintained asset, cash flow indexing, prioritisation of maintenance financing, incorporation of financial indicators and audit of operational maintenance cost had a very high influence (VHI: 9.00–10.00) on MM of buildings, 5 elements, namely yearly MBs certainties, valuation of maintenance operation budget, maintenance operation financing, market and financial terms of operations and optimisation of finance outsourcing had a high influence (HI: 7.00–8.99), while other 5 elements, namely optimisation of business profitability, asset maintenance prioritisation, maintenance operation system improvement, optimising maintenance resources and planning for future asset replacement have medium influence (MI: 5:00–6.99). The experts' panellist suggested three new elements, which have been marked by the * sign during the round one survey (see Table 4). As suggested by the panellist, the new elements were maintenance funding, maintenance materials assessment and a corruption-free maintenance process. These new elements were included for assessment as suggested by the experts in the second round (see Table 4).

Round two results of Delphi study

In round two of the Delphi study, a total of 21 elements constituted the elements of MB of building in the NBE. Out of the 21 elements, 15 elements have good consensus. Ten of the elements that recorded (VHI: 9.00–10.00) were MB implementation with mean (x¯) score of (9.14) emerge first, corruption-free maintenance process with x¯ value of (9.13) emerge second. Similarly, reduction in maintenance expenditure and maintenance financial plan with x¯ value of (8.93) jointly ranked third, cost implication of maintained asset with x¯ value of (8.87) emerge fifth, cash flow indexing with x¯ value of (8.81) ranked sixth, prioritisation of maintenance financing with x¯ value of (8.73) ranked seventh, maintenance funding with x¯ value of (8.67) ranked eighth, incorporation of financial indicators with x¯ value of (8.47) ranked ninth and audit of operational maintenance cost with x¯ value of (8.38) ranked tenth in MM of buildings in the NBE (see Table 4). Whereas 5 elements that recorded (HI: 7.00–8.99) were yearly MBs certainties with x¯ value of (8.26) ranked 11th, valuation of maintenance operation budget and maintenance operation financing both jointly ranked 12th with x¯ value of (8.20), market and financial terms of operations with x¯ value of (8.00) ranked 14th and optimisation of finance outsourcing with x¯ value of (7.99) ranked 15th. The last 6 elements with a medium influence value (MI: 5.00–6.99) were the optimisation of business profitability with x¯ value of (6.40) ranked 16th, maintenance materials assessment with x¯ value of (6.33) ranked 17th, asset maintenance prioritisation with x¯ value of (6.01) ranked 18th, maintenance operation system improvement with x¯ value of (6.00) ranked 19th, optimising maintenance resources with x¯ value of (5.90) ranked 20th and planning for future asset replacement with x¯ value of (5.60) ranked 21st. As detailed in Table 4, the IQD scores used in determining the consensus levels varied among the elements, while the σx scores amongst 15 of the elements show a very strong consistency level and little variability in the panellist responses. Moreover, the Cronbach's alpha value of the 10 elements that recorded IQD score VHI: 9.00–10.00 and the other 5 elements that recorded IQD score HI: 7.00–8.99 were found to be 0.719. This shows that the data collection instrument is reliable, and the responses obtained from it can be relied upon to be valid.

Discussions

The study aimed to establish whether the elements of the MB found in other countries that influence the MM relevant to the maintenance of buildings in the NBE. In total, 21 elements of the MB were found to influence the MM of buildings in NBE. Though the level of consensus amongst the elements varies, the IQD scores indicated consensus for 15 of the elements, with the 1QD being ≤1 or ≥1, 1 ≤ 2, respectively. Similarly, (σx) of the 15 elements indicated consistency in the experts' responses, as their σx values were at most 1.

Of the top ten elements that recorded (VHI: 9.00–10.00), six elements are similar to findings of the studies by Visser (1998) and Pinjala et al. (2006). These include MB implementation, corruption-free maintenance process, maintenance financial plan, maintenance funding, cash flow index and the prioritisation of maintenance financing. These were the elements of the MB that influence the effectiveness of MM of buildings. The findings are also in line with the study of (Omar et al., 2017). Equally, the other four elements, namely reduction in maintenance expenditure, cost implication for maintained asset maintenance funding, incorporation of financial indicators and audit for the operational maintenance cost aligns with the studies by Ahzahar et al. (2011) and also affirmed by the study of Mohd-Noor et al. (2011) who highlighted the elements for MB. The study's finding based on the RII for measuring consensus in the Delphi study outcomes showed that strong consensus was achieved for all the ten elements. Their median (M) score is between 9 and 10 and RII is between 0.80 and 1.0, with IQD ≤1. Comparatively, of the five elements that recorded (HI: 7.00–8.99), three of the elements were consistent with the studies by Campbell (1995) and Wireman (2005) that focussed on yearly MBs certainties, optimisation of finance outsourcing and valuation of MB as elements of the MB that influence the effectiveness of MM of buildings. The findings are comparable with Flores-Colen and de Brito (2010) study, which listed the various MB elements influencing MM of buildings. The other two elements, namely market and financial terms of operations and maintenance operation financing aligns with the study of Pintelon and Gelders (1992) and Puķīte and Geipele (2017) on various MB elements for the effectiveness of MM of buildings. Based on the RII for measuring consensus in the Delphi study outcomes, the study's finding showed that good consensus was achieved for all five elements. As their M scores are between 7 and 8.99, RII scores are between 0.60 and 0.79, with IQD ≥1, 1 ≤ 2.

The 15 elements' respective scores indicate consistency in the expert panellists' response as their σx values were between 0.00 and 1.00. Additionally, the Cronbach's alpha value for the 15 elements was 0.719. This agreed with Pallant (2007) and Rehbinder (2011) that a scale with a Cronbach's alpha higher than 0.7 is required to create a reliable construct of multiple variables. Thus, in this study, a Cronbach's alpha value of 0.7 and above is considered reliable and indicative of internal consistency amongst the variables of MB elements.

Lastly, the remaining six elements, namely the optimisation of business profitability, maintenance materials assessment, asset maintenance prioritisation, maintenance operation system improvement, optimising maintenance resources and planning for future asset replacement based on the study findings, all recorded weak consensus. The RII for measuring consensus in the Delphi study outcomes showed that weak consensus was achieved for all the six elements as their M scores is ≤ 6.99 and RII scores is ≤ 0.59, with IQD ≥2, 1 ≤ 3. Also, the 6 elements' respective scores for standard σx indicate inconsistency and variability in the expert panellists' response as their σx values were above 1. Moreover, the Cronbach's alpha value for the six elements with the IQD of ≥2, 1 ≤ 3 were found to be 0.719, which is within the acceptable 0.7 required to create a reliable construct of multiple variables. However, with the low IQD score, it is thus considered that the elements were unindicative of internal consistency. This indicates that the six elements cannot be incorporated into MB standards for maintenance operations in developing countries. Thus, they do not influence MB for MM of buildings within the NBE.

Practical and theoretical implications of this work

The critical outcome of this study shows it has theoretical, practical and policy implementations. Empirically, the study affirms that elements of MB are required for effective MM of buildings in the NBE. The identified elements of MB will assist maintenance organisations in the NBE in preparing an accurate maintenance cost and estimate for maintenance activities. The study theoretically advances that MB for MM of buildings represents 15 essential elements. Amongst these vital elements were MB implementation and corruption-free maintenance process, indicating that MB is the key to effective maintenance and corruption-free maintenance. On a practical note, the study establishes the relative influence of each validated element to guide stakeholders in the built environment in preparing an operational estimate for required consumables, spare parts, human resources and other expenses. It ought to guide the stakeholders in the planning and controlling the use of available resources towards achieving the maintenance set objectives.

Similarly, in preparing an operational estimate, the findings of this study will assist built environment professionals in designing a good MB for preventive maintenance with a better MB recording. It will also help to develop a financial plan when considering seasonal maintenance need. Moreover, the findings of this study will assist built environment professionals in guiding against inaccurate financial planning for maintenance operations. Finally, the findings of this study will help the built environment professionals reduce wastage, improve the maintenance process and increase productivity amongst maintenance personnel.

Conclusions and recommendations

This study was carried out to establish whether the element of MB found in other countries that influence MM of buildings are relevant in the maintenance of buildings in the NBE. The expert panellists appraised a total of 21 MB elements that were perceived to have influenced MM. However, out of the total elements validated, 15 elements of the MB were found to have influenced MM of buildings in NBE industry. Moreover, these elements were consistent with MB elements that have been identified by earlier studies in some international and national contexts.

In conclusion, the study's findings indicated that 15 out of the identified elements of MB from developed countries are valid for developing countries and are effective for MM in the NBE. These elements will help the built environment in organising maintenance activities in such a way as to make the best use of limited resources by providing an objective basis for decisions such as which components should be encompassed in maintenance activities. Therefore, the objectives of the study were achieved. Based on the study's findings, it is thus recommended that in preparing MB for MM of buildings in the NBE, the validated elements of MB should be sought since these elements are vital to the built environment industry toward MM of buildings.

The study also recommends that the MB elements identified from this study should guide industry practitioners in the maintenance practice. However, due to time constraints, the study was limited to build environment professionals within Southwestern Nigeria, which interprets to show that the findings cannot be entirely generalised for the NBE. However, it is pertinent to know that professionals in Southwestern Nigeria used for this study account for the significant professional activities in the NBE. Conversely, future studies can be carried out to test the MB elements in practice to ensure the study's findings apply to the built environment practically. This can be done by incorporating all built environment practitioners who have first-hand experience with day-to-day maintenance activities.

Figures

Input-output maintenance management model

Figure 1

Input-output maintenance management model

Decision-making-based maintenance management model

Figure 2

Decision-making-based maintenance management model

Delphi process diagram

Figure 3

Delphi process diagram

Delphi study round one results – elements of maintenance budget maintenance for maintenance management of buildings in the Nigerian built environment industry

Figure 4

Delphi study round one results – elements of maintenance budget maintenance for maintenance management of buildings in the Nigerian built environment industry

Elements of maintenance budget

ElementsAuthor(s)Countries
Prioritisation of maintenance financePintelon and Gelders (1992)Belgium
Visser (1998)Australia
Campbell (1995)Canada
Flores-Colen and de Brito (2010)Portugal
Wireman (2005)The USA
Valuation of maintenance operation budgetPintelon and Gelders (1992)Belgium
Visser (1998)Australia
Flores-Colen and de Brito (2010)Portugal
Ahzahar et al. (2011)Malaysia
Maintenance operation financingPintelon and Gelders (1992)Belgium
Visser (1998)Australia
Campbell (1995)Canada
Wireman (2005)The USA
Puķīte and Geipele (2017)Latvia
Optimising maintenance resourcesPintelon and Gelders (1992)Belgium
Visser (1998)Australia
Campbell (1995)Canada
Wireman (2005)The USA
Puķīte and Geipele (2017)Latvia
Market and financing terms of operationsCampbell (1995)Canada
Wireman (2005)The USA
Pinjala et al. (2006)Belgium
Puķīte and Geipele (2017)Latvia
Maintenance budget implementationCampbell (1995)Canada
Wireman (2005)The USA
Pinjala et al. (2006)Belgium
Puķīte and Geipele (2017)Latvia
Asset maintenance prioritisationPintelon and Gelders (1992)Latvia
Visser (1998)Australia
Marquez and Gupta (2006)Spain
Pinjala et al. (2006)Belgium
Optimisation of finance outsourcingVisser (1998)Australia
Ahzahar et al. (2011)Malaysia
Mekasha (2018)Ethiopia
Audit of maintenance operational costKaria et al. (2014)Malaysia
Srivastava et al. (2020)India
Yearly maintenance budget certaintiesKaria et al. (2014)Malaysia
Ahzahar et al. (2011)Malaysia
Omar et al. (2017)Malaysia
Mohd-Noor et al. (2011)Malaysia
Cash flow indexMarquez and Gupta (2006)Spain
Pinjala et al. (2006)Belgium
Mohd-Noor et al. (2011)Malaysia
Planning for future asset replacementPintelon and Gelders (1992)Belgium
Karia et al. (2014)Malaysia
Ahzahar et al. (2011)Malaysia
Mohd-Noor et al. (2011)Malaysia
Mekasha (2018)Ethiopia
Cost implication of maintained assetMarquez and Gupta (2006)Spain
Pinjala et al. (2006)Belgium
Mohd-Noor et al. (2011)Malaysia
Mekasha (2018)Ethiopia
Reduction in maintenance expenditureVisser (1998)Australia
Ahzahar et al. (2011)Malaysia
Mohd-Noor et al. (2011)Malaysia
Maintenance financial planAhzahar et al. (2011)Malaysia
Omar et al. (2017)Malaysia
Mekasha (2018)Ethiopia
Mohd-Noor et al. (2011)Malaysia
Maintenance operation system improvementFlores-Colen and de Brito (2010)Portugal
Karia et al. (2014)Malaysia
Omar et al. (2017)Malaysia
Srivastava et al. (2020)India
Incorporation of financial indicatorsFlores-Colen and de Brito (2010)Portugal
Omar et al. (2017)Malaysia
Mekasha (2018)Ethiopia
Optimisation of business profitabilityVisser (1998)Belgium
Flores-Colen and de Brito (2010)Portugal
Omar et al. (2017)Malaysia
Mekasha (2018)Ethiopia
Maintenance funding × (suggested by experts)
Maintenance materials assessment × (suggest by experts)
Corruption-free × maintenance process (suggest by experts)

Source(s): Researchers' literature survey (2021)

Demographic profile of respondents'

Respondents' demographic profileFrequency (n = 15)Percentage (%)
Highest qualification
Doctor of Philosophy (PhD)746.67
Master's degree426.67
Bachelor's degree320.00
Higher national diploma16.67
Total15100
Designation
Lecturer640.00
Maintenance manager of in-use buildings426.67
Facility manager320.00
Research institution of buildings213.33
Total15100
Years of experience
0–516.67
6–10213.33
11–20533.33
21–30320.00
Over 31 years426.67
Total15100
Professional affiliation
Nigerian Institute of Building320.00
Nigeria Institute of Quantity Surveyors320.00
Nigeria Institute of Architects213.33
Nigeria Society of Engineers16.67
Nigeria Institute of Estate Surveyors and Valuer213.33
Real Estate Developers Association of Nigeria426.67
Total15100

Relative importance index for measuring consensus in Delphi study outcomes

S/nConsensusMedian (M)Relative impact index (RII)Interquartile deviation (IQD)
1Strong consensus9–100.80–1.00≤1
2Good consensus7–8.990.60–0.79≥1, 1 ≤ 2
3Weak consensus≤6.99≤0.59≥2, 1 ≤ 3

Round two Delphi study results – elements of maintenance budget for maintenance management of buildings in Nigerian built environment

Sub-attributes of maintenance budgetMedian (M)Mean (x¯)Standard deviation (σx)Interquartile deviation (IQD)Mean scores ranking (R)
Prioritization of maintenance financing98.730.440.557
Valuation of maintenance operation budget88.200.831.0012
Maintenance operation financing88.200.651.0012
Optimizing maintenance resources65.901.462.0020
Market and financial terms of operations88.000.520.0014
Maintenance budget implementation99.140.340.001
Asset maintenance prioritization66.011.162.0018
Optimization of finance outsourcing87.990.520.0015
Audit of maintenance operational cost98.380.721.0010
Yearly maintenance budgets certainties88.260.851.0011
Cash flow indexing98.810.751.006
Planning for future asset replacement55.601.592.0021
Cost implication of maintained asset98.870.640.505
Reduction in maintenance expenditure98.930.700.503
Maintenance financial plan98.930.590.003
Maintenance operation system improvement66.001.252.0019
Incorporation of financial indicators98.470.831.009
Optimization of business profitability66.401.302.0016
Maintenance funding*98.670.620.508
Maintenance materials assessment*66.331.402.0017
Corruption-free maintenance process*99.130.741.002

Note(s): *Values connotes variables suggested by expert pannelists

Criteria/checklist for constituting the panel of experts for the Delphi study

Questionnaire itemsMarks possibleExpected maximum marksExpected minimum marksObtained minimum marks
Q1. Please indicate your highest level of education
Higher diploma1 point 1 point1 point
Bachelor's degree2 points
Master's degree3 points
Doctoral degree4 points4 points
Q2. Are you a member of any professional body in Nigeria?
Yes3 points3 points 3 points
No1 point 1 point
Q3 Please indicate your years of experience in the Nigerian built environment industry
0–5 years1 point 1 point1 point
6–11 years2 points
11–20 years3 points
21–30 years4 points
Over 31 years5 points5 points
Total 12 points3 points5 points

Note(s): Minimum obtained marks of 5 points qualified an expert to be part of the Delphi panel

Appendix

Table A1

References

Aghimien, L.M., Aigbavboa, C.O., Anumba, C. and Thwala, W.D. (2021), “A confirmatory factor analysis of the challenges of effective management of construction workforce in South Africa”, Journal of Engineering, Design, and Technology, Vol. ahead-of-print No. ahead-of-print, pp. 1-13.

Aliu, J., Aigbavboa, C. and Oke, A. (2021a), “Examining undergraduate courses relevant to the built environment in the 4IR era: a Delphi study approach”, in Emerging Research in Sustainable Energy and Buildings for a Low-Carbon Future, Springer, Singapore, pp. 195-215.

Aliu, J., Aigbavboa, C. and Thwala, W. (2021b), A 21st Century Employability Skills Improvement Framework for the Construction Industry, Routledge, New York.

Ahzahar, N., Karim, N.A., Hassan, S.H. and Eman, J. (2011), “A study of contribution factors to building failures and defects in construction industry”, Procedia Engineering, Vol. 20, pp. 249-255.

Aigbavboa, C.O. (2014), “An integrated beneficiary-centered satisfaction model for publicly funded housing schemes in South Africa”, Published doctoral dissertation, University of Johannesburg.

Alsyouf, I. (2006), “Measuring maintenance performance using a balanced scorecard approach”, Journal of Quality in Maintenance Engineering, Vol. 12 No. 2, pp. 133-149.

Alzaben, H. (2015), “Development of a maintenance management framework to facilitate the delivery of healthcare provisions in the kingdom of Saudia Arabia”, Published doctoral dissertation, Nottingham Trent University.

Ameyaw, E.E., Hu, Y., Shan, M., Chan, A.P. and Le, Y. (2016), “Application of Delphi method in construction engineering and management research: a quantitative perspective”, Journal of Civil Engineering and Management, Vol. 22 No. 8, pp. 991-1000.

Arumsari, P. and Rarasati, A.D. (2017), “Maintenance strategy for public-rented residential building: a case study in Jakarta, Indonesia”, Built Environment Project and Asset Management. doi: 10.1108/BEPAM-11-2015-0067.

Campbell, J.D. (1995), “Outsourcing in maintenance management: a valid alternative to self‐provision”, Journal of Quality in Maintenance Engineering, Vol. 1 No. 3, pp. 18-24.

Delbecq, A.L., Van de Ven, A.H. and Gustafson, D.H. (1975), Group Techniques for Program Planning: A Guide to Nominal Group and Delphi Processes, Scott, Foresman.

Fletcher, A.J. and Marchildon, G.P. (2014), “Using the Delphi method for qualitative, participatory action research in health leadership”, International Journal of Qualitative Methods, Vol. 13 No. 1, pp. 1-18.

Flores-Colen, I. and de Brito, J. (2010), “A systematic approach for maintenance budgeting of buildings façades based on predictive and preventive strategies”, Construction and Building Materials, Vol. 24 No. 9, pp. 1718-1729.

Hamid, M.Y., Alexander, K. and Baldry, D. (2007), “The causes and effect of deferred maintenance on higher education buildings”, Journal of the University of Salford, Vol. 1 No. 1, pp. 78-88.

Hastings, N.A.J. (2015), Physical Asset Management: with an Introduction to ISO55000, Springer, Melbourne.

Hsu, C.C. and Sandford, B.A. (2007), “The Delphi technique: making sense of consensus”, Practical Assessment, Research, and Evaluation, Vol. 12 No. 1, p. 10.

Ismail, Z.-A. (2014), “System development toward effective maintenance management practices”, Built Environment Project and Asset Management, Vol. 4 No. 4, pp. 406-422.

Karia, N., Asaari, M.H.A.H. and Saleh, H. (2014), “Exploring maintenance management in service sector: a case study”, Proceedings of the 2014 International Conference on Industrial Engineering and Operation Management, Bali, Indonesia, January 7-9, pp. 3119-3128.

Leung, W.C. (2001), “How to design a questionnaire”, BMJ, Vol. 322 No. S6, pp. 187-189.

Lind, H. and Muyingo, H. (2012), “Building maintenance strategies: planning under uncertainty”, Property Management, Vol. 30 No. 1, pp. 14-28.

Ling, F. and Formoso, C. (2014), “Project management and asset management in emerging economies”, Built Environment Project and Asset Management, Vol. 4 No. 4, pp. 1-2, doi: 10.1108/BEPAM-07-2014-0031.

Linstone, H.A. and Turoff, M. (Eds) (1975), The Delphi Method, Addison-Wesley, Reading, MA, pp. 3-12.

Loo, R. (2002), “The Delphi method: a powerful tool for strategic management”, Policing: An International Journal, Vol. 2 No. 4, pp. 762-769.

Márquez, A.C. (2007), The Maintenance Management Framework: Models and Methods for Complex Systems Maintenance, Springer Science & Business Media, London.

Marquez, A.C. and Gupta, J.N. (2006), “Contemporary maintenance management: process, framework, and supporting pillars”, Omega, Vol. 34 No. 3, pp. 313-326.

Mekasha, E. (2018), “Maintenance management framework development for competitiveness of food and beverage industry: a case study on Asku Plc”, Thesis Draft, Addis Ababa Institute of Technology, Addis Ababa University.

Mohd-Noor, N., Hamid, M.Y., Abdul-Ghani, A.A. and Haron, S.N. (2011), “Building maintenance budget determination: an exploration study in the Malaysia government practice”, Procedia Engineering, Vol. 20, pp. 435-444.

Odent, N. and Berthellemy, J. (2002), “Bridges asset ageing process model and theoretical simulation of the effect of a maintenance budget policy on bridge condition in natural heritage”, First Internal Conference on Bridge Maintenance, Safety and Management (IABMAS), pp. 14-17.

Ogunbayo, B.F. and Aigbavboa, O.C. (2019), “Maintenance requirements of students' residential facility in higher educational institution (HEI) in Nigeria”, IOP Conference Series: Materials Science and Engineering, IOP Publishing, Vol. 640 No. 1, 012014.

Omar, M.F., Ibrahim, F.A. and Omar, W.M.S.W. (2017), “Key performance indicators for maintenance management effectiveness of public hospital building”, MATEC Web of Conferences, Vol. 97, EDP Sciences, 01056.

Pallant, J.F. (2007), SPSS Survival Manual: A Step-by-step Guide to Data Analysis with SPSS, McGrath Hill, New York, NY.

Pantzartzis, E., Deka, L., Price, A.D., Tann, C., Mills, G.R. and Rich-Mahadkar, S. (2016), “Sustainable management of NHS assets backlog maintenance”, Built Environment Project and Asset Management, Vol. 6 No. 5, pp. 532-552, doi: 10.1108/BEPAM-09-2015-0055.

Pinjala, S.K., Pintelon, L. and Vereecke, A. (2006), “An empirical investigation of the relationship between business and maintenance strategies”, International Journal of Production Economics, Vol. 104 No. 1, pp. 214-229.

Pintelon, L.M. and Gelders, L.F. (1992), “Maintenance management decision making”, European Journal of Operational Research, Vol. 58 No. 3, pp. 301-317.

Pintelon, L. and Muchiri, P.N. (2009), “Safety and maintenance”, in Handbook of Maintenance Management and Engineering, Springer, London, pp. 613-648.

Puķīte, I. and Geipele, I. (2017), “Different approaches to building management and maintenance meaning explanation”, Procedia Engineering, Vol. 172, pp. 905-912.

Rehbinder, E. (2011), “Do personal networks affect the success of foreign venture performance – an empirical analysis of nordic firms in Poland”, Copenhagen Business School.

Rowe, G. and Wright, G. (2001), “Expert opinions in forecasting: the role of the Delphi technique”, in Principles of Forecasting, Springer, Boston, MA, pp. 125-144.

Sarantakos, S. (2005), Social Research, 3rd ed., Palgrave Macmillan, Basingstoke.

Somiah, M.K., Aigbavboa, C.O. and Thwala, W.D. (2020), “Success strategies for competitive advantage in the Ghanaian construction industry: a Delphi study”, in Aigbavboa, C. and Thwala, W. (Eds), The Construction Industry in the Fourth Industrial Revolution. CIDB 2019, Springer, Cham, doi: 10.1007/978-3-030-26528-1_55.

Spedding, A. (Ed.), (1987), “Building maintenance economics and management”, Transactions of the Research and Development Conference on the Management and Economics of Maintenance of Built Assets: Held at Bristol Polytechnic (Department of Surveying), E. & FN Spon, 13-15 May 1987.

Srivastava, A.K., Kumar, G. and Gupta, P. (2020), “Estimating maintenance budget using Monte Carlo simulation”, Life Cycle Reliability and Safety Engineering, Vol. 9 No. 1, pp. 77-89.

Tilakasiri, K.K. (2015), “Development of new frameworks, standards, and principles via Delphi data collection method”, International Journal of Science and Research, Vol. 4 No. 9, pp. 1189-1194.

Tsang, A.H.C. (2002), “Strategic dimensions of maintenance management”, Journal of Quality in Maintenance Engineering, Vol. 8 No. 1, pp. 7-39.

Visser, J.K. (1998), “Maintenance management: an appraisal of current strategies”, ICOMS Conference, Melbourne, Australia.

Wireman, T. (2005), Developing Performance Indicators for Managing Maintenance, Industrial Press, New York.

Further reading

CEN, E. (2001), EN 13306: Maintenance Terminology, European Committee for Standardisation.

Corresponding author

Babatunde Fatai Ogunbayo can be contacted at: tundeogunbayo7@gmail.com