To read this content please select one of the options below:

Do JIT lines perform better than traditionally balanced lines?

Satya S. Chakravorty (Coles School of Business Administration, Kennesaw State College, Marietta, Georgia, USA)
J. Brian Atwater (College of Business & Administration, University of Colorado, Colorado Springs, USA)

International Journal of Operations & Production Management

ISSN: 0144-3577

Article publication date: 1 February 1995

1558

Abstract

Over the past decade, JIT approach for designing and operating lines has evolved to compete on time dimensions. Traditionally, the lines designed and operated using line balancing approach are considered optimal. Uses simulation methodology to compare each of these approaches under various levels of system variability and total inventory in the system. Shows that when system variability is low, the JIT line produces lower cycle time at almost all levels of total inventory in the system. However, when system variability is high the balanced line yields lower cycle time, especially at lower levels of inventory in the system.

Keywords

Citation

Chakravorty, S.S. and Brian Atwater, J. (1995), "Do JIT lines perform better than traditionally balanced lines?", International Journal of Operations & Production Management, Vol. 15 No. 2, pp. 77-88. https://doi.org/10.1108/01443579510080436

Publisher

:

MCB UP Ltd

Copyright © 1995, MCB UP Limited

Related articles