Table of contents
Application of discrete‐event simulation to study the paving operation of asphalt concrete
Marwa M. Hassan, Stan GruberTo evaluate and optimize asphalt paving operations taking place in the reconstruction project of Interstate 74 in the USA using simulation.
Using genetic algorithms in optimizing construction material delivery schedules
Maged Georgy, Sameh Y. BasilyTo develop a systematic procedure and a computerized tool for optimizing the delivery and inventory of materials, as part of a comprehensive material management system in…
Modelling construction material logistics system with stochastic Petri nets
S. Thomas Ng, Yuan Fang, Onuegbu O. UgwuThe purpose of this paper is to examine the potential of applying Petri nets to improve construction material logistics analysis and modelling.
Impact of the internal business environment on knowledge management within construction organisations
Le Chen, Sherif MohamedRecent knowledge management (KM) literature suggests that KM activities are influenced by the elements of the internal business environment (BE) of organisations. This paper…
ISSN:
1471-4175Online date, start – end:
2001Copyright Holder:
Emerald Publishing LimitedOpen Access:
hybridEditors:
- Dr Anil Sawhney
- Professor Srinath Perera